Skip to main content

Mesnier Primary School

Affton, Missouri

Project Details

Retrofit
237 Roof Mount Panels
9 Fronius Inverters
90kW Power Production

Project Description

Mesnier Primary School prioritized energy savings by adding solar in their most recent project in efforts to update their facility. With the roof needing replaced, it was an excellent time to partner with Enertech, Daikin TMI, and Coltrane Systems, Inc., to provide a fully engineered and installed solar system. The Heliene monocrystalline solar panels paired with the Fronius Symo Advanced inverters provides a 23% annual utility cost savings.

Installation Details

The Heliene monocrystalline solar panels also incorporate bi-facial technology enabling additional energy harvesting from the rear side of the panel. The ten-degree tilt of the Unirac RM10 racking system allows for reflected light from the roof and surrounding panels to reach the rear of the panels. The Fronius Solar.Web allows for full monitoring of the energy produced by this system and provides a live update to the school during operation.

Savings

Annual Utility Costs
Before Solar: $61,671
After Solar: $47,544
Total Savings: 23% annually, $1,166/month

Partners Involved

Coltrane Systems, LLC.
Daikin TMI

Related Spotlights